STAND-ALONE HOUSES – SOLD OUT

Type B

The stand-alone houses type B are limited series houses located in the southern part of the golf course in OKOL Lake Park. They are situated near the centre of the village with a wonderful view of Rila mountains and southern exposure.

The houses have one residential floor with spacious living room and kitchen with dining area. Type B1 and B2 have two bedrooms and two bathrooms whereas B2+ have three bedrooms and three bathrooms.

The houses are offered in a package price, together with the plot in which they are located. The price is final and does not depend on the size of the plot.

The houses have a fully finished exterior design and landscaping of the yard with irrigation system, fully furnished, according to a pre-designed and visualized interior design („Premium Plus“).

More information about the Levels of Completion, please see the Construction Standard.

Stand-alone house

B1 – Sold Out

1
NO OF FLOORS
2
BEDROOMS
100 m2
TBA
TERRACE
500 m2
PROPERTY
YES
PARKING SPACE
BASEMENT
LAYOUTS
TECHNICAL PASSPORT B1
€ 153 750
PRICE WITH VAT PREMIUM PLUS

Stand-alone house

B2 – Sold out

1
NO OF FLOORS
2
BEDROOMS
110,07 m2
TBA
TERRACE
≈550 m2
PROPERTY
YES
PARKING SPACE
BASEMENT
LAYOUTS
TECHNICAL PASSPORT B2
€ 198 500
PRICE WITH VAT PREMIUM PLUS

Stand-alone house

B2+ – Sold out

1
NO OF FLOORS
3
BEDROOMS
136,41 m2
TBA
TERRACE
≈650 m2
PROPERTY
YES
PARKING SPACE
BASEMENT
LAYOUTS
TECHNICAL PASSPORT B2+
€ 248 500
PRICE WITH VAT PREMIUM PLUS

PAYMENT PLAN

For purchasing a stand-alone house type B

AMOUNT

PAYMENT

MILESTONE AND TIMELINE

Plot selection

DOCUMENTS

AMOUNT

6000 EUR

PAYMENT

Property reservation fee

MILESTONE AND TIMELINE

Property reservation

DOCUMENTS

Reservation fee agreement

AMOUNT

PAYMENT

MILESTONE AND TIMELINE

Approved Designs

DOCUMENTS

Preliminary contract

AMOUNT

20 %

PAYMENT

Advance payment
(the Reservation fee is deducted from the advance payment)

MILESTONE AND TIMELINE

Commencing construction works – 06.2024

DOCUMENTS

Protocol Sample 2 for opening of the construction site

AMOUNT

50 %

PAYMENT

Interim payment

MILESTONE AND TIMELINE

Completion of rough construction – 10.2024

DOCUMENTS

Protocol under Article 181, Para 3 of the LSP

AMOUNT

20 %

PAYMENT

Interim payment

MILESTONE AND TIMELINE

Protocol Sample 15

DOCUMENTS

Protocol Sample 15

AMOUNT

10 %

PAYMENT

Final payment

MILESTONE AND TIMELINE

Building Commissioning –  06.2025

DOCUMENTS

Аct for entry into exploitation of the House; Notary Deed